|
Product Details:
|
Product Name:: | Carbon Steel Butt Welding Reducing Tee | Type:: | Tee |
---|---|---|---|
Standard:: | GB / ANSI /JIS / DIN | Material:: | Carbon Steel |
Technology:: | Hydraulic Bulging And Hot Pressing | Shape:: | Reducing |
High Light: | cs Butt Weld Reducing Tee,Forged Butt Weld Tee |
Tee is a kind of pipe fitting with one inlet and two outlets; or two inlets and one outlet, which can be divided into T shape and Y shape, and can also be divided into equal diameter tee and reduced diameter tee, which is used for the convergence of three same or different pipelines. Tee is mainly used to change the direction of the fluid pipe connector. Reducing tee is a section of main pipe plus a small branch pipe. Obviously, two big sizes are main pipes, and the small size in the middle is branch pipe. Reducing tee is a kind of tee, which is used at branch pipe of main pipeline.
In industry, the pressure requirement of reducing tee pipe is higher, the maximum pressure can reach 600 kg, and the pressure of water pipe in life is lower, generally 16 kg. Reducing tee is generally not used in pure oxygen pipeline. This kind of pipeline generally has pressure, and the oxygen activity is greater at this time. For example, if the reducing tee is used, as long as the sundries in the pipeline move with the oxygen air flow, the change of the pipe diameter and the change of the flow rate may cause the collision between the sundries and the pipe to produce the fire source or the electrostatic discharge due to the change of the flow rate, it may cause the fire and explosion of the pure oxygen pipe.
Standard: GB/T12459-2005 GB/T13401-2005 GB/T10752-2005
Material: Carbon steel: ASTM / ASME a234 wpb-wpc
Size: Seamless tee: 1 / 2 "~ 32" DN15 ~ DN80, Slotted tee: 6 "~ 60" DN150 ~ DN1500
Maximum wall thickness: 200mm
Surface treatment: anti-oil; anti-painting
Butt welding reducing tee is a steel hot pressed or forged elbow. Its connection form is directly butt welding the tee and steel pipe. The main manufacturing standards of butt welding tee are generally GB / t12459, GB / T13401, ASME b16.9, sh3408, sh3409, Hg / t21635, Hg / t21631, SY / t0510. The production process of reducing tee includes hydraulic bulging and hot press bulging. Hydraulic bulging is a forming process of expanding branch pipe by axial compensation of metal material.
Nominal Diameter | Outside Diameter | Center to End | |||||
DI | D2 | ||||||
DN | NPS | Series A | Series B | Series A | Series B | C | M |
15x15x15 | 1/2x1/2x1/2 | 21.3 | 18 | 21.3 | 18 | 25 | 25 |
15x15x10 | 1/2x1/2x3/8 | 21.3 | 18 | 17.3 | 14 | 25 | 25 |
15x15x8 | 1/2x1/2x1/4 | 21.3 | 18 | 13.7 | 10 | 25 | 25 |
20x20x20 | 3/4x 3/4x3/4 | 26.9 | 25 | 26.9 | 25 | 29 | 29 |
20x20x15 | 3/4x3/4x1/2 | 26.9 | 25 | 21.3 | 18 | 29 | 29 |
20x20x10 | 3/4x3/4x3/8 | 26.9 | 25 | 17.3 | 14 | 29 | 29 |
25x25x25 | 1x1x1 | 33.7 | 32 | 33.7 | 32 | 38 | 33 |
25x25*20 | 1x1x 3/4 | 33.7 | 32 | 26.9 | 25 | 38 | 33 |
25x25x15 | lx 1x 1/2 | 33.7 | 32 | 21.3 | 18 | 38 | 33 |
32x32x32 | 1.1/4x1.1/4x1. 1/4 | 424 | 33 | 42.4 | 33 | 43 | 48 |
32x32x25 | 1.1/4x1.1/4x1 | 424 | 33 | 33.7 | 32 | 43 | 48 |
32x32x20 | 1.1/4x1.l/4x3/4 | 424 | 33 | 26.9 | 25 | 43 | 48 |
32x32x15 | 1.1/4x1.1/4x1/2 | 424 | 33 | 21.3 | 18 | 43 | 48 |
40x40x40 | 1.1/2x1.1/2x1. 1/2 | 43.3 | 45 | 48.3 | 45 | 57 | 57 |
40x40x32 | 1.1/2x1.1/2x1. 1/4 | 43.3 | 45 | 42.4 | 33 | 57 | 57 |
40x40x25 | 1.1/2x1.1/2x1 | 43.3 | 45 | 33.7 | 32 | 57 | 57 |
40x40x20 | 1.1/2x 1.l/2x3/4 | 43.3 | 45 | 26.9 | 25 | 57 | 57 |
40x40x15 | 1.1/2x1.l/2xl/2 | 43.3 | 45 | 21.3 | 18 | 57 | 57 |
50*5050 | 2x2x2 | 60.3 | 57 | 60.3 | 57 | 64 | 64 |
50x50*40 | 2x2x1.1/2 | 60.3 | 57 | 48.3 | 45 | 64 | 60 |
50x50x32 | 2x2x1.1/4 | 60.3 | 57 | 42.4 | 33 | 64 | 57 |
50x50x25 | 2x2x1 | 60.3 | 57 | 33.7 | 32 | 64 | 51 |
50x50x20 | 2x 2x3/4 | 60.3 | 57 | 26.9 | 25 | 64 | 44 |
65x65x65 | 2.1/2x2/1/2x2 1/2 | 73.0 | 76 | 73.0 | 76 | 76 | 76 |
65x65x50 | 2 1/2x2/1/2x2 | 73.0 | 76 | 60.3 | 57 | 76 | 70 |
65x65x40 | 2.1/2x2/1/2x11/2 | 73.0 | 76 | 48.3 | 45 | 76 | 67 |
Package
a. Plastic bubble bag package b.Wove bag package c.Pallet d. Customized
Our factory have high ability for production, the delivery time is 45days for small quantity, or if you are hurry for that, we can arrange and meet your shipping date.
Contact Person: Rachel Zhang
Tel: 13679287344